MAIN BUSINESS
上若古嘎特水电项目(Upper
Mangale)位于尼泊尔西部开发区的Myagdi地区,为引水式开发,电站引若古嘎特芒嘎雷电站厂房尾水,经左岸有压引水隧洞、压力管道向地面厂房供水发电。总投资7100万美元,设计引用流量15.2m³/s,装机2台,总装机容量48.5MW,多年平均发电量2.844亿kW.h。
More>>
上若古嘎特水电项目(Upper Mangale)位于尼泊尔西部开发区的Myagdi地区,为引水式开发,电站引若古嘎特芒嘎雷电站厂房尾水,经左岸有压引水隧洞、压力管道向地面厂房供水发电。总投资7100万美元,设计引用流量15.2m³/s,装机2台,总装机容量48.5MW,多年平均发电量2.844亿kW.h。项目由尼泊尔当地银行提供贷款,目前开展顺利,总进度已完成65%,预计在2025年下半年前达到商运条件。
The Upper Mangale Hydropower Project is located in the Myagdi district of the Western Development Region in Nepal. It is a diversion-type development where water from the Rahughat Mangale hydropower plant is diverted to the powerhouse of the Upper Mangale station. Through a left bank pressure diversion tunnel and penstock, water is supplied to the surface powerhouse for electricity generation.The total investment for the project is 71 million US dollars, with a designed discharge of 15.2m³/s and equipped with 2 units, installed capacity of 48.5MW. The project is expected to generate an average annual electricity output of 28.44 million kWh.
Loan for the project is provided by local banks in Nepal. Currently, the project is progressing smoothly, with 65% of the overall progress completed. It is anticipated to achieve commercial operation status by the second half of 2025.