It is a diversion type power station that is composed of low dam, diversion tunnel and ground power house at the confluence of Xiaohezi Ditch and Yajiageng River. It has an installed capacity of 2×10.5kw, a designed diversion flow of 9.8m3/s, a guaranteed output of 4.48MW and an annual output of 930,000 kW•h.